Estimate the electricity and emissions of training a model on GPUs. Then change one thing at a time and see which choices matter most.

The interactive demo needs JavaScript.
What our demo simplifies. Only the GPUs and the data center's overhead are counted. Processors, memory, storage and networking add more, and so does manufacturing the hardware. The result is a lower bound for comparing choices and should thus not be read as a measurement.
Sources. The German mix of 2024 is 363 g CO₂/kWh, an estimate by the Umweltbundesamt (opens in a new tab). The EU mix of 2024 is 211 g CO₂e/kWh, from Ember via Our World in Data (opens in a new tab). Wind, solar, gas and coal are lifecycle medians from IPCC AR5 (2014), Annex III. The average data center overhead (PUE) of 1.56 in 2024 is from the Uptime Institute global survey. GPU power is the manufacturers' rated board power.